RFQ Preparation Checklist
- Required delivery date
- Testing parameters
- Quantity (1-50pcs)
- Prototype acceptance criteria and measurement method
- Scale-up intent and annual volume assumption
Fast-turnaround magnetic assembly prototypes designed to close technical risk early and transfer cleanly into production-intent execution.
| Program Metric | Typical Range | Procurement Value |
|---|---|---|
| Lead Time | 5-7 days | Accelerates design iteration speed |
| Prototype Yield | Project-specific baseline | Signals transfer risk before pilot release |
| Data Completeness | Drawing + test + deviation package | Improves quote and scale-up decision quality |
OEM capability work adds value only when output is transferable to procurement and manufacturing. Require explicit deliverables, measurable acceptance, and decision ownership at each gate so the project can move from engineering review to commercial execution without rework loops.


In many programs, a portion of NRE can be offset or rebated when volume orders are released under agreed terms.
Yes. We recommend production-intent materials whenever possible to reduce transfer surprises.
Yes. We can structure prototype output so engineering, quality, and sourcing teams can evaluate pilot readiness consistently.